Serving Wake County, NC Call (720) 869-7552 Mon–Fri 7:00 AM - 6:00 PM

Decking

Decks: Builds, Board Replacement and Sealing

New deck builds, board replacement, railing work and sealing for Raleigh-area homes, with footings and detailing suited to humid Carolina summers.

Back 40 builds new decks, swaps out failed boards, rebuilds railings and seals wood. Projects are quoted individually after the structure is inspected, because what a deck needs is decided by its frame, not by its surface. A deck with soft boards and a sound frame is a weekend of carpentry. A deck with tight boards and rotting ledger attachment is a safety problem wearing a nice hat.

Scope of work

Call (720) 869-7552 to have an existing deck looked over or a new one measured.

Included

What the job covers

Typical range: Quoted per project

Coverage

Decking near you

Questions

Before you call

Why do decks in this climate fail where they do?

<p>Moisture that has nowhere to go. Summers here are hot and humid, thunderstorms soak everything through, and shaded framing under a deck can stay damp for days. The failure points are predictable: the ledger where the deck attaches to the house, if it was ever installed without proper flashing; the tops of joists, where water sits under a board and slowly rots a channel; the bottom of posts sitting on or near grade; and the stair stringers, which take splash from every rain. Those get checked before anything gets quoted.</p>

What matters about footings in clay?

<p>Deck footings have to bear on undisturbed soil below the frost line, and in Piedmont clay the more common problem is not frost — it is expansion. Clay swells with water and shrinks when it dries, so a shallow footing gets lifted and dropped through the year until the deck is out of level and the guardrail no longer lines up. Footings sized and set correctly at the start avoid the chase later. On newer subdivisions built on graded fill, knowing how deep the fill goes before it hits native soil changes the plan entirely.</p>

Board replacement or full rebuild?

<p>Replace boards when the frame is sound, the fasteners still hold, and the damage is limited to surface decking or a few stair treads. Rebuild when joists are soft, when the ledger connection is questionable, or when the railing does not meet current height and infill spacing. It is worth being blunt about this: cosmetic repairs on an unsound frame make a deck look safer than it is.</p>

Does sealing actually matter?

<p>Yes, and mostly for movement rather than looks. Wood that repeatedly soaks and dries cups, splits and pulls fasteners. A film or penetrating finish slows that cycle. Timing matters — the deck has to be clean and genuinely dry, which in a Carolina summer means watching the forecast rather than the calendar.</p>

Free quote

Tell us what the yard needs

Call and talk to someone who does the work, or send the details and we'll come back to you the same day.

Call (720) 869-7552

Goes straight to us. No account, no spam.

Call (720) 869-7552